You are here: Home

Search results

17 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Project Troff document Copper Creek In-Stream Habitat Restoration Project
This project improved riparian zones, water quality, appropriate sediment flows and restoring physical habitat for multiple listed aquatic species in the Copper Creek watershed, within the Upper Tennessee River Basin. (Photo: The low water bridge that was removed and replaced with a new bridge that spans the river.)
Located in Funded Projects / SARP Projects W2B
Project Troff document Using positive interactions between bivalves and seagrass to reduce habitat fragmentation and restore essential fish habitat
Lead by the University of North Carolina at Chapel Hill, this project will restore eelgrass cover that had declined by propeller scaring through introducing mussels. A natural fertilization and predator protection interaction study will also take place.
Located in Funded Projects / SARP Projects W2B
Project Crabtree Swamp Habitat Restoration
The restoration of Crabtree Swamp is an innovative, "first of its kind" project, in which a previously channelized drainage basin is being returned to a blackwater hardwood swamp in which the floodplain is being recreated via earthmoving and replanting into functional habitat for fish, invertebrates and other wildlife. To match resources, the restoration project has been subdivided into 10 reaches.
Located in Funded Projects / SARP Projects W2B
Project Harpeth River Restoration
As part of a jointly funded project via the National Fish Passage Program, the totality of this project is removing a lowhead dam and restoring the immediate area to riffle/run habitat for the benefit of improved water quality and native fish habitat in the Harpeth River, TN.
Located in Funded Projects / SARP Projects W2B
Project Nashville crayfish Habitat Restoration on the Nashville Zoo Property
Mill Creek Watershed has been negatively affected by urbanization,resulting in increased sedimentation,reduced habitat quality, ultimately resulting in the Nashville crayfish being federally listed. This project will restore an unnamed tributary of Mill Creek by removing a barrier and restoring connectivity of the tributary.
Located in Funded Projects / SARP Projects W2B
Project Troff document Valley River Watershed Habitat Restoration Project
Located in Funded Projects / SARP Projects W2B
Hathaway Brook Dam Removal and Stream Restoration in MA
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in Funded Projects / EBTJV Projects
Expanding Brook Trout in Willow Creek, Pennsylvania
This project will expand suitable habitat in Willow Creek located within Blandon, Berks County, Pennsylvania. Willow Creek is a coldwater fishery that supports one of the most productive wild brook trout populations in the state. This project will restore fish habitat and stream bank stabilization by implementing in-stream habitat enhancement devices in over 5000 feet of the creek. Additionally, over 6 acres of floodplain will be re-vegetated with native trees and shrubs. Local stocking efforts will be shifted to other nearby streams. The project also include an outreach component. Kiosks will be constructed to commemorate the effort and educate future generations. Pamphlets will be distributed to interested citizens.
Located in Funded Projects / EBTJV Projects
Thorn Creek Aquatic Passage Project, Pendelton County, West Virginia
This project will remove the 9 identified fish passage barriers in a 50 square mile wild brook trout watershed in Thorn Creek of the South Branch of the Potomac. These impediments block passage in one or both directions, and serve to sustain an outward migration of brook trout into waters which, currently, are lethally warm for brook trout in typical summer conditions. Removal of the blockages will open over 25 miles of perennial stream to brook trout, improving the long term security of the population. Thorn Creek serves as a brook trout nursery for the upper South Branch of the Potomac.
Located in Funded Projects / EBTJV Projects
Wood Additions into the Sheepscot, Narraguagus, Machias Watersheds, Maine
In 2007, Project SHARE and the Department of Marine Resources Bureau of Sea-Run Fisheries and Habitat and private land owners undertook a "chop and drop" large wood addition project. Wood was added to streams with the intent to increase habitat complexity and salmonid survival. This project expands the large wood treatment locations to include the Sheepscot drainage, along with treatment locations on the Machias, East Machias and Narraguagus River drainages. It adds nine additional large wood treatment sites enhancing approximately 4 miles of stream for brook trout.
Located in Funded Projects / EBTJV Projects