File Octet Stream Removal of Two Dams in the Wetmore Run Watershed, PA_FY12 Project
As part of a plan to upgrade their public water supply to a non-dam alternative, the Borough of Galeton agreed to remove two dams and their associated impoundments. The dams were located on Wetmore Run and Right Branch of Wetmore Run, Potter County, PA. Both streams are classified as High Quality – Coldwater Fishery (HQ – CWF) by the Pennsylvania Department of Environmental Protection (PA DEP) and drain a predominantly forested watershed comprised of ~60% public land. The barriers blocked upstream Brook Trout passage to approximately 8.5 miles of headwater habitat, contributed to the elevation of instream temperatures, interrupted the natural flow regime, and negatively impacted ecosystem function. As a result of the dam removals, almost 8.5 miles of headwater habitat was reconnected to the rest of the upper Pine Creek Watershed, which contains several intact eastern Brook Trout populations.
Located in Projects / Project Completion Reports
File Octet Stream Dam Removals on an Unnamed Tributary to Frankstown Branch, PA_FY13 Project
Kladder Dam was removed in September 2014 and the tributary through the former impoundment was restored to an appropriate gradient to match the watershed. Stream restoration materials included native soil and rock, clay from the dam’s core, sediment from behind the dam, and Large Wood Debris, all originating on the site. In addition, a riparian corridor was planted in the former impoundment, and several rock jack-dams and brick lining in about 100 feet of the stream channel above the former impoundment were removed by hand.
Located in Projects / Project Completion Reports
File Friends of Winooski River completion report 2022
Friends of the Winooski River completed the removal of Camp Wihakowi Dam in Northfield, Vermont in October 2020. The circa 1920 dam was causing flooding upstream and sediment pollution downstream. Complete removal of the dam resulted in impressive gains: it reconnected 6 miles of Bull Run and an additional 21 miles of upstream habitat, allowed the stream to once again access the larger floodplain, and protected downstream habitat from the smothering effects of sedimentation. But of course, a dam removal project doesn't stop when the stone and concrete has been removed. To improve recovery and stabilization, project partners performed additional work on the pedestrian bridge, access road, and former pool area in 2021. Monitoring shows the river is free flowing, sediment transport has been naturalized, the restored floodplains are successfully vegetating, and habitat has been improved. According to EBTJV's calculations, the project brought an estimated $14.6M in socioeconomic benefits.
Located in Projects / Project Completion Reports
Person Troff document Calvert, Patrick
Located in Practitioners (individuals)
Removal of Two Dams in the Wetmore Run Watershed, Potter County, PA
This project will remove the only two dams in the Wetmore Run Watershed in Potter County, Pennsylvania opening 8.5 miles of habitat for brook trout. Removal of the dams will also eliminate thermal pollution and restore lotic ecosystem function.
Located in Funded Projects / EBTJV Projects
Thunder Brook Dam Removal, Chesire, Massachusetts
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in Funded Projects / EBTJV Projects
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. One dam will be removed on Browns Run to open 1 mile of habitat and reconnect currently fragmented native brook trout populations in the headwaters of the basin.
Located in Funded Projects / EBTJV Projects
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in Funded Projects / EBTJV Projects
Hathaway Brook Dam Removal and Stream Restoration in MA
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in Funded Projects / EBTJV Projects