Culvert Replacement in the West Musquash Tributary. ME_FY18 Project
This project replaced a culvert with an open-bottomed arch and installed a 15’ wide earth berm to separate the St. Croix and Machias watersheds to prevent invasive species from range expansion.
West Musquash Tributary (ME)_Final Report.pdf — PDF document, 2404 kB (2462636 bytes)
Document Actions