Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

53 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Chop and Drop in the Sunday River, Maine
Brook trout habitat in the Sunday River drainage has been degraded by poor land use practices, including timber harvesting, log driving, farming, and commercial and recreational development. Much of the river and its tributaries are unstable, over-widened, and lacking in deep pools, thereby reducing nursery and adult brook trout habitat. Although degradation is being addressed through a comprehensive watershed survey and main-stem restoration effort, the causal problem of accelerated runoff has not been addressed. This proposal will assess the efficacy of adding woody debris to reduce peak flows, create pools, and trap organics to enrich depauperate headwater streams.
Located in Funded Projects / EBTJV Projects
EBTJV announces $240,604 in funding for five habitat conservation projects
FY24 awards announcement
Located in News & Events / News Inbox
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in Funded Projects / EBTJV Projects
Provides cost-share and design expertise to landowners to remove unwanted dams and replace culverts.
Located in The Story of Wild Brook Trout / Landowner Resources
Helicopter-assisted Large Wood Additions, Narraguagus River, TWP 34, ME
This project will add wood complexity to a 0.42-mile reach of the mainstem Narraguagus River.
Located in Projects / 2024 Projects
In-Stream Habitat Restoration in the Meduxnekeag Watershed, Maine
This project will restore 1.9 miles of habitat on the Meduxnekeag River mainstem and 0.25 miles of habitat on its north branch for brook trout within trust land for the Houlton Band of Maliseet Indians. The project will return the river to a more natural, sustainable state of in-stream habitat complexity, increase brook trout habitat quality, and promote interest in future restoration activities.
Located in Projects / 2006 - 2018 Projects / 2013 Projects
In-Stream Habitat Restoration in the Meduxnekeag Watershed, Maine
This project will restore 1.9 miles of habitat on the Meduxnekeag River mainstem and 0.25 miles of habitat on its north branch for brook trout within trust land for the Houlton Band of Maliseet Indians. The project will return the river to a more natural, sustainable state of in-stream habitat complexity, increase brook trout habitat quality, and promote interest in future restoration activities.
Located in Funded Projects / EBTJV Projects
File chemical/x-pdb Jam Black Brook Culvert Replacement, ME_FY12 Project
The goals of the project were: (1) To remove an obstruction to upstream fish passage for brook trout, Atlantic salmon and other resident and migratory fish. (2) To restore access to 9.8 miles of stream habitat upstream of the obstruction. (3) To restore natural sediment and woody debris transport through the crossing site. (4) To improve flood capacity at the Magog Road crossing, reducing the risk of debris jams or overtopping the road. (5) To provide a demonstration site in mid‐coast Maine for an appropriate stream crossing developed in cooperation with the municipality.
Located in Projects / Project Completion Reports
Jam Black Brook Culvert Replacement in Searsmont, Maine
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in Projects / 2006 - 2018 Projects / 2012 Projects