Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

38 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
File Troff document Willow Creek Restoration, PA_FY10 Project
This reports provides a summary of the work completed on this project from October, 2012 to September, 2013.
Located in Projects / Project Completion Reports
File chemical/x-pdb Tipton Creek Culvert Replacement, NC_FY10 Project
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The channel was reconstructed through the crossing using the dimension, pattern, and profile of the reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over the last year since construction, the site has experienced several small flood events. The site remains stable, passable to all aquatic species, and looks more and more natural every year as planted and natural vegetation establishes.
Located in Projects / Project Completion Reports
File Assessing the Efficacy of Remediating Episodic Low pH (and High Aluminum) Concentrations in Headwater Brook Trout Streams with Clam Shell Additions_FY09 Project
This project demonstrated that clam shells could be utilized to increase pH and decrease detrimental inorganic aluminum concentrations. In Dead Stream, water chemistry has improved by approximately 1.0 pH unit, and total fish densities increased two-fold. In Canaan Brook water chemistry has improved by 1.0 pH unit and First Lake Stream improved by 0.7 pH unit, while fish densities have increased 2- and 6- times, respectively. Macroinvertebrate communities have improved somewhat, especially among mayflies and stoneflies, while amphipods and snails have appeared for the first time. However, even at treated sites, macroinvertebrate communities continue to have low diversity and may not achieve Class A water quality. Overall, by adding buffering capacity, there has been a boost to the bottom of the food chain which has contributed to improved fish abundance and diversity. In the fourth year, biological communities are still adapting to the new conditions.
Located in Projects / Project Completion Reports
File EBTJV 10 Year Anniversary Info Graphic (2014)
This info graphic summarizes the EBTJV's accomplishments during its first 10 years (2004-2014).
Located in Science and Data / EBTJV Reports / EBTJV Print Material
Celebrating 1,000 Culverts
THE U.S. FOREST SERVICE AND ITS MANY PARTNERS ARE BUILDING BETTER CULVERTS TO OPEN WATERWAYS FOR FISH TO GROW, REPRODUCE AND SURVIVE, TO IMPROVE THE RESILIENCY OF ROADS TO FLOODING, AND TO PROTECT TRANSPORTATION INFRASTRUCTURE FOR COMMUNITIES
Located in News & Events / News Inbox
File EBTJV - Celebrating Ten Years (2004-2014)
This infographic highlights EBTJV accomplishments during its first 10 years as a partnership.
Located in Projects / EBTJV Operational Evaluation Reports / Accomplishment Summaries
File Troff document 2013 MSCGP Grant Performance Report
This document describes the grant-related accomplishments achieved during the 1/1/13 to 12/31/13 performance period.
Located in Projects / EBTJV Operational Grants / 2013 MSCGP Grant
File Assessment of EBTJV Priorities Addressed by Fish Habitat Conservation Projects, 2006-2012
This document contains an overview of the EBTJV priorities targeted by fish habitat conservation projects that received funding from the FWS NFHAP budget appropriations between 2006 and 2012.
Located in Projects / EBTJV Operational Evaluation Reports