Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

34 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Removal of Illegally Introduced and Missed Rainbow Trout from Lynn Camp Prong, Great Smoky Mountain National Park, Tennessee
This project will remove the illegally introduced and missed rainbow trout from the Lynn Camp Prong Watershed in Great Smoky Mountain National Park. Once complete, the project will reconnect brook trout populations in three tributary streams thus eliminating fragmentation in this watershed. This reconnection of stream segments will result in the largest contiguous brook trout population in the Great Smoky Mountain National Park.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Removal of Illegally Introduced and Missed Rainbow Trout from Lynn Camp Prong, Great Smoky Mountain National Park, Tennessee
This project will remove the illegally introduced and missed rainbow trout from the Lynn Camp Prong Watershed in Great Smoky Mountain National Park. Once complete, the project will reconnect brook trout populations in three tributary streams thus eliminating fragmentation in this watershed. This reconnection of stream segments will result in the largest contiguous brook trout population in the Great Smoky Mountain National Park.
Located in Funded Projects / EBTJV Projects
Project Restoration of aquatic/riparian habitats of the Edwards Plateau at the South Llano River State Park
This project will restore aquatic/riparian habitats of the Edwards Plateau at the South Llano River State Park in Texas.
Located in Funded Projects / SARP Projects W2B
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in Funded Projects / EBTJV Projects
Project Restoring Intertidal Oyster Reefs in Mosquito Lagoon
This project, lead by the Brevard Zoo, will increase acreage of intertidal oyster reef and assist in wake reduction.
Located in Funded Projects / SARP Projects W2B
Project C++ source code St. Catherine Creek Aquatic Habitat Assessment in support of GCPO LCC
This project will assess habitat in St. Catherine Creek, Mississippi, in support of GCPO LCC.
Located in Funded Projects / SARP Projects W2B
Thunder Brook Dam Removal, Chesire, Massachusetts
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Thunder Brook Dam Removal, Chesire, Massachusetts
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in Funded Projects / EBTJV Projects
Project Troff document Ulele Springs Restoration Project
This project, run by the Ecosphere Restoration Institute, Inc, will create a natural spring and restore native wetland vegetation within the state of Florida.
Located in Funded Projects / SARP Projects W2B