-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Funded Projects
/
EBTJV Projects
-
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Funded Projects
/
EBTJV Projects
-
Brook Trout Restoration in the Chattahoochee National Forest, Georgia
-
This project will restore fragmented poor quality habitat and brook trout populations on the Chattahoochee National Forest in Georgia by removing and replacing a culvert on Bryant Creek that is perched and acts as a barrier to fish movement. Additionally, nine miles of habitat will be improved by placing 54 structures in nine streams: Bryant Creek, Chester Creek, Lovinggood Creek, Long Creek, Underwood Creek, Walnut Fork, An unnamed tributary to Ammons Branch, Smith Branch, and Chastain Branch. Electrofishing will be used to renovate three streams: Stover Creek, Walnut Fork, and Tate Branch.
Located in
Funded Projects
/
EBTJV Projects
-
Removal of Illegally Introduced and Missed Rainbow Trout from Lynn Camp Prong, Great Smoky Mountain National Park, Tennessee
-
This project will remove the illegally introduced and missed rainbow trout from the Lynn Camp Prong Watershed in Great Smoky Mountain National Park. Once complete, the project will reconnect brook trout populations in three tributary streams thus eliminating fragmentation in this watershed. This reconnection of stream segments will result in the largest contiguous brook trout population in the Great Smoky Mountain National Park.
Located in
Funded Projects
/
EBTJV Projects