-
January 2012 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's January 12, 2012 meeting that was conducted by teleconference.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2012 NFH Board Meetings
-
April 2012 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's April 17 - 18, 2012 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2012 NFH Board Meetings
-
July 2012 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's July 10 - 11, 2012 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2012 NFH Board Meetings
-
October 2012 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's October 16 - 17, 2012 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2012 NFH Board Meetings
-
Removal of Two Dams in the Wetmore Run Watershed, Potter County, PA
-
This project will remove the only two dams in the Wetmore Run Watershed in Potter County, Pennsylvania opening 8.5 miles of habitat for brook trout. Removal of the dams will also eliminate thermal pollution and restore lotic ecosystem function.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Restoration of Native Charr in Big Wadleigh Pond Maine
-
This project will restore 157 acres of habitat for native brook trout and arctic charr in Big Wadleigh Pond in northwest Maine by collecting eggs/brook stock from the dwindling adult populations and rearing them in a private hatchery while the pond is chemically treated to eliminate an illegal introduction of rainbow smelt. Restoration will also benefit anglers at this unique and popular fishing destination.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Jam Black Brook Culvert Replacement in Searsmont, Maine
-
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Nash Stream Restoration Project, Coos County, New Hampshire
-
This project will restore approximately 5.5 miles of instream habitat on the mainstem of Nash Stream between its confluence with Emerson and Long Mountain Brooks. Restoration activities will include boulder placement, pool construction, large wood additions, floodplain reconnection, and riparian vegetation.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
-
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Oats Run, Upper Shavers Fork, Aquatic Passage Project in Pocahontas County, WV
-
This project will restore habitat linkages between a brook trout spawning tributary in Oats Run and the mainstem of the Upper Shaver's Fork at Spruce West Virginia. One passage barrier will be removed and replaced with passage friendly culverts and natural stream design techniques will be utilized above and below the new structure to ensure fish passage. The project will provide 4 miles of passage for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects