Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

43 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Project Stream Bank & Riparian Restoration along the Wild and Scenic Cossatot River on the Ouachita NF
Six riparian sites have severe erosion from loss of riparian vegetation and heavy recreational use. Riparian habitat function will be restored by stabilizing stream banks and planting vegetation. Stream habitat cover will increase with addition of materials to repair stream banks. Campsites will be designated and hardened. To measure effectiveness, water samples taken every 3 months over the past 4 years will continue for at least the next 4 years by the Cossatot River Watch Stream Team to compare pre- and post-restoration.
Located in Funded Projects / SARP Projects W2B
File chemical/x-pdb Tipton Creek Culvert Replacement, NC_FY10 Project
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The channel was reconstructed through the crossing using the dimension, pattern, and profile of the reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over the last year since construction, the site has experienced several small flood events. The site remains stable, passable to all aquatic species, and looks more and more natural every year as planted and natural vegetation establishes.
Located in Projects / Project Completion Reports
Project Upper Savannah Biological Assessment of Redeye Bass
Located in Funded Projects / SARP Projects W2B