Restoring habitat connectivity in Machias and Saint Croix River tributary streams, ME_FY11 Project
-
Through this project, Downeast Lakes Land Trust (DLLT) continued its work with partners to restore brook trout habitat on priority streams within its 55,678-acre Downeast Lakes Community Forest by removing passage barriers. Of the four sites included in the original proposal (Billy Brown Brook/Shaw St., Amazon Brook/Amazon Rd., Grand Lake Brook/Fourth Lake Rd., and Fourth Lake Trib./Belden Brook Rd), two were completed using NRCS funding received after the initial proposal was submitted to USFWS. As a result, Eastern Brook Trout Joint Venture funding was used to restore fish passage at two additional sites at South Branch/Little River Rd and Towers Brook/Little River Rd.
Located in
Projects
/
Project Completion Reports
-
Tipton Creek Culvert Replacement, NC_FY10 Project
-
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was
removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing
aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to
velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the
USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing
was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The
channel was reconstructed through the crossing using the dimension, pattern, and profile of the
reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial
materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over
the last year since construction, the site has experienced several small flood events. The site remains
stable, passable to all aquatic species, and looks more and more natural every year as planted and
natural vegetation establishes.
Located in
Projects
/
Project Completion Reports
-
Upper Shavers Fork Aquatic Passage Project, West Virginia
-
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Upper Shavers Fork Aquatic Passage Project, West Virginia
-
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in
Funded Projects
/
EBTJV Projects