-
Brook Trout Restoration in the Chattahoochee National Forest, Georgia
-
This project will restore fragmented poor quality habitat and brook trout populations on the Chattahoochee National Forest in Georgia by removing and replacing a culvert on Bryant Creek that is perched and acts as a barrier to fish movement. Additionally, nine miles of habitat will be improved by placing 54 structures in nine streams: Bryant Creek, Chester Creek, Lovinggood Creek, Long Creek, Underwood Creek, Walnut Fork, An unnamed tributary to Ammons Branch, Smith Branch, and Chastain Branch. Electrofishing will be used to renovate three streams: Stover Creek, Walnut Fork, and Tate Branch.
Located in
Funded Projects
/
EBTJV Projects
-
Removal of Illegally Introduced and Missed Rainbow Trout from Lynn Camp Prong, Great Smoky Mountain National Park, Tennessee
-
This project will remove the illegally introduced and missed rainbow trout from the Lynn Camp Prong Watershed in Great Smoky Mountain National Park. Once complete, the project will reconnect brook trout populations in three tributary streams thus eliminating fragmentation in this watershed. This reconnection of stream segments will result in the largest contiguous brook trout population in the Great Smoky Mountain National Park.
Located in
Funded Projects
/
EBTJV Projects
-
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
-
The two leading causes of brook trout habitat degradation in Massachusetts have been identified through the EBTJV as fragmentation by dams and roads. The subwatershed containing Hamant Brook was identified as high impact from dam fragmentation and medium impact from road fragmentation. This project will remove three dams and one impassable culvert, allowing access from mainstem habitat to a coldwater tributary and converting 70% of the project area from impounded to free-flowing. Once complete, the project will open nearly 8 miles of habitat and provide access to more diverse free flowing and coldwater habitats for brook trout and riverine fish species.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
-
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. One dam will be removed on Browns Run to open 1 mile of habitat and reconnect currently fragmented native brook trout populations in the headwaters of the basin.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
-
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in
Funded Projects
/
EBTJV Projects
-
Culvert Replacement and Instream Habitat Restoration on Indian Stream, New Hampshire
-
In 2006, an initial watershed based assessment of coldwater habitat conditions was completed by Trout Unlimited in the Upper Connecticut in New Hampshire and Vermont. In 2008, Trout Unlimited designated the Upper Connecticut as one if its Home Rivers Initiatives, the only one in New England. Trout Unlimited's assessment identified fish habitat problems through the watershed, including lack of riparian habitat, poor instream habitat diversity and complexity, and inadequate stream crossings. This project will initiate the first phase of a long term culvert removal and instream habitat program by replacing four high priority culverts and implementing instream woody habitat restorations in Indian Stream, starting on the East Branch. The culverts to be replaced are on four important brook trout nursery streams: Dry Creek, Johns Brook, Hidden Brook, and Alder Brook. The project will restore 3 miles of habitat on east branch, the largest tributary to Indian Stream.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Stream Connectivity in the WB Machias River in Maine
-
Project SHARE and the Service completed a basin wide stream-road crossing and fisheries assessment in the WB Machias River. There are 43 fish bearing road crossings in this subbasin that limit aquatic connectivity. To date, 11 crossing have been replaced and 8 crossings have been decommissioned. Funding has been secured to remove all but two of the remaining barriers. This project will remove one of those last two barriers in the basin, reconnecting approximately 0.5 miles of habitat for brook trout and restore ecological stream function.
Located in
Funded Projects
/
EBTJV Projects
-
Brook Trout Restoration and Expansion in Garth Run, Virginia
-
This project will restore and improve stream and riparian habitat within a 2,357 foot project area located in the headwaters of Garth Run which was severely impacted by catastrophic flooding that occurred in 1995. Wild brook trout were extirpated as a result of habitat degradation which led to increased water temperatures and a lack of complex habitat. Brook trout were re-introduced in 2008 as part of Virginia's Conservation Strategy as the stream has begun to naturally heal itself. This project will restore 2.3 miles of brook trout habitat.
Located in
Funded Projects
/
EBTJV Projects
-
Batten Kill Restoration Near Eagleville, New York
-
This project will implement stream restoration at five sites along the Batten Kill in New York using principles of fluvial geomorphology to enhance a total of 2 miles of stream for the purposes of: improving brook trout habitat, removing fish passage barriers, stabilizing and restoring streambanks and riparian areas, increasing large woody debris in the river system, providing demonstration projects for the community, and improving fishing access and recreational opportunities.
Located in
Funded Projects
/
EBTJV Projects
-
Wood Additions into the Sheepscot, Narraguagus, Machias Watersheds, Maine
-
In 2007, Project SHARE and the Department of Marine Resources Bureau of Sea-Run Fisheries and Habitat and private land owners undertook a "chop and drop" large wood addition project. Wood was added to streams with the intent to increase habitat complexity and salmonid survival. This project expands the large wood treatment locations to include the Sheepscot drainage, along with treatment locations on the Machias, East Machias and Narraguagus River drainages. It adds nine additional large wood treatment sites enhancing approximately 4 miles of stream for brook trout.
Located in
Funded Projects
/
EBTJV Projects