-
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
-
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. One dam will be removed on Browns Run to open 1 mile of habitat and reconnect currently fragmented native brook trout populations in the headwaters of the basin.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
-
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Brook Trout Restoration and Expansion in Garth Run, Virginia
-
This project will restore and improve stream and riparian habitat within a 2,357 foot project area located in the headwaters of Garth Run which was severely impacted by catastrophic flooding that occurred in 1995. Wild brook trout were extirpated as a result of habitat degradation which led to increased water temperatures and a lack of complex habitat. Brook trout were re-introduced in 2008 as part of Virginia's Conservation Strategy as the stream has begun to naturally heal itself. This project will restore 2.3 miles of brook trout habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Thorn Creek Aquatic Passage Project, Pendelton County, West Virginia
-
This project will remove the 9 identified fish passage barriers in a 50 square mile wild brook trout watershed in Thorn Creek of the South Branch of the Potomac. These impediments block passage in one or both directions, and serve to sustain an outward migration of brook trout into waters which, currently, are lethally warm for brook trout in typical summer conditions. Removal of the blockages will open over 25 miles of perennial stream to brook trout, improving the long term security of the population. Thorn Creek serves as a brook trout nursery for the upper South Branch of the Potomac.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Green River Enhancement within the Green River WMA, KY
-
The Green River and Green River Lake and provide aquatic habitat in the Green River Wildlife Management Area. The river is in declining condition due to severe erosion over almost four decades. Its restoration can allow it to support thriving populations of white bass, smallmouth bass, rock bass, flathead catfish, walleye, and muskellunge, and provide sport challenges to anglers.
Located in
Funded Projects
/
SARP Projects W2B
-
Copper Creek In-Stream Habitat Restoration Project
-
This project improved riparian zones, water quality, appropriate sediment flows and restoring physical habitat for multiple listed aquatic species in the Copper Creek watershed, within the Upper Tennessee River Basin. (Photo: The low water bridge that was removed and replaced with a new bridge that spans the river.)
Located in
Funded Projects
/
SARP Projects W2B
-
Raccoon Creek Stream Restoration for Imperiled Aquatic Species in lower Etowah River Drainage
-
This project restored stream areas of Raccoon Creek for imperiled aquatic species in lower Etowah River drainage, Georgia. This project has resulted in several new partnerships, including a collaborative planning workshop for Paulding County held by SARP and the Southeast Watershed Forum.
Located in
Funded Projects
/
SARP Projects W2B
-
Valley River Watershed Habitat Restoration Project
-
Located in
Funded Projects
/
SARP Projects W2B
-
Nashville crayfish Habitat Restoration on the Nashville Zoo Property
-
Mill Creek Watershed has been negatively affected by urbanization,resulting in increased sedimentation,reduced habitat quality, ultimately resulting in the Nashville crayfish being federally listed. This project will restore an unnamed tributary of Mill Creek by removing a barrier and restoring connectivity of the tributary.
Located in
Funded Projects
/
SARP Projects W2B
-
Harpeth River Restoration
-
As part of a jointly funded project via the National Fish Passage Program, the totality of this project is removing a lowhead dam and restoring the immediate area to riffle/run habitat for the benefit of improved water quality and native fish habitat in the Harpeth River, TN.
Located in
Funded Projects
/
SARP Projects W2B