Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

23 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Brook Trout Restoration in the Chattahoochee National Forest, Georgia
This project will restore fragmented poor quality habitat and brook trout populations on the Chattahoochee National Forest in Georgia by removing and replacing a culvert on Bryant Creek that is perched and acts as a barrier to fish movement. Additionally, nine miles of habitat will be improved by placing 54 structures in nine streams: Bryant Creek, Chester Creek, Lovinggood Creek, Long Creek, Underwood Creek, Walnut Fork, An unnamed tributary to Ammons Branch, Smith Branch, and Chastain Branch. Electrofishing will be used to renovate three streams: Stover Creek, Walnut Fork, and Tate Branch.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Removal of Illegally Introduced and Missed Rainbow Trout from Lynn Camp Prong, Great Smoky Mountain National Park, Tennessee
This project will remove the illegally introduced and missed rainbow trout from the Lynn Camp Prong Watershed in Great Smoky Mountain National Park. Once complete, the project will reconnect brook trout populations in three tributary streams thus eliminating fragmentation in this watershed. This reconnection of stream segments will result in the largest contiguous brook trout population in the Great Smoky Mountain National Park.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Restoring Stream Connectivity in the WB Machias River in Maine
Project SHARE and the Service completed a basin wide stream-road crossing and fisheries assessment in the WB Machias River. There are 43 fish bearing road crossings in this subbasin that limit aquatic connectivity. To date, 11 crossing have been replaced and 8 crossings have been decommissioned. Funding has been secured to remove all but two of the remaining barriers. This project will remove one of those last two barriers in the basin, reconnecting approximately 0.5 miles of habitat for brook trout and restore ecological stream function.
Located in Projects / 2006 - 2018 Projects / 2010 Projects
Brook trout habitat vulnerability was assessed within an Appalachian watershed. • Increased discharge largely offset effects of increased air temperature. • No consistent loss of suitable brook trout habitat by end of 21st century • However, periods of low flow resulted in a loss of habitat at the network-scale. • Persistence of refugia below tributaries should enable metapopulation persistence.
Located in Science and Data / Brook Trout Related Publications
Person Troff document Calvert, Patrick
Located in Practitioners (individuals)
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Funded Projects / EBTJV Projects
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in Funded Projects / EBTJV Projects
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in Funded Projects / EBTJV Projects