-
Watershed-Based Approach to Channel Stabilization and Sediment Control in Pleasant Run Creek
-
Excessive sediment from channelized tributaries of the Hatchie River (TN) are degrading downstream aquatic habitat. Pleasant Run Creek is a channelized tributary to the Hatchie River, exhibiting significant soil erosion and channel incision problems. This project seeks to implement channel stabilization measures on private lands that will improve riparian habitat on Pleasant Run Creek and reduce sediment loading to the Hatchie River.
Located in
Funded Projects
/
SARP Projects W2B
-
Community-Based and Larger-Scale Oyster Restoration in ACE Basin NERR, South Carolina
-
This project will build intertidal shorelines with oyster reefs.
Located in
Funded Projects
/
SARP Projects W2B
-
Port Orange Living Shoreline and Oyster Reef Restoration System
-
This project, run primarily by the Marine Discovery Center, will increase intertidal shoreline and oyster reefs and vegetation will be planted.
Located in
Funded Projects
/
SARP Projects W2B
-
Restoring Intertidal Oyster Reefs in Mosquito Lagoon
-
This project, lead by the Brevard Zoo, will increase acreage of intertidal oyster reef and assist in wake reduction.
Located in
Funded Projects
/
SARP Projects W2B
-
Wolf Pen Gap OHV Trail Complex Stream Crossing Improvement
-
This project will improve stream crossings and trails at the Wolf Pen Gap OHV Trail Complex in Arkansas. It will also improve connectivity and open stream habitat for fish.
Located in
Funded Projects
/
SARP Projects W2B
-
Kentucky-Bayou de Chien/Jackson Creek Tributary Restoration Project
-
Located in
Funded Projects
/
SARP Projects W2B
-
Greene County Park Stream Restoration and Interpretative Trail NFHAP / SARP Project
-
Located in
Funded Projects
/
SARP Projects W2B
-
Raccoon Creek Stream Restoration for Imperiled Aquatic Species in lower Etowah River Drainage
-
This project restored stream areas of Raccoon Creek for imperiled aquatic species in lower Etowah River drainage, Georgia. This project has resulted in several new partnerships, including a collaborative planning workshop for Paulding County held by SARP and the Southeast Watershed Forum.
Located in
Funded Projects
/
SARP Projects W2B
-
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects